First one from yesterday with our dinner and the decorations. Weather wise it was a washout with rain all afternoon and evening, however this morning was a different story, no wind, sunshine what more could you ask for.
It was quite a while before we met another boat, needless to say at a bridge with bushes on the Offside. Last time I was this way there was rubbish disposal at the pub, now like Fazeley its at the marina.
There was a steady flow of water entering the canal just prior to Fenny Tunnel, the blocks really take the power out of it.
Its a long time since I last passed under one of these, I am guessing the plastic drums are for balance for when the deck is lowered.
Claydon locks were all against us and half way down we caught up with a single hander, well he worked as a single hander with an elderly foreign lady onboard who just took photos, videos and chatted into her phone sitting in the well deck. In the past we have always encounter boats moored in the pound below the second lock, for some reason that is now a no no.
Another interesting notice at Elkington Lock, I wonder what the story behind it is,not a problem with low water today, its over topping the top gates.
The boat ahead stopped just past Cropredy Marina so we were able to go by, we were only doing one more lock, Cropredy lock before calling into the
services and then dropping into a mooring almost opposite between the section reserved for CRT work boats and the long term moorings for the night
6½ miles, 9 Locks in 4½ hours