``

Saturday, 17 August 2019

Tewkesbury Saturday 17 August 2019

Day : Saturday
Date : 17 August 2019
Start : 1000
Finish : 1430 Tewkesbury

I have uploaded our proposed route to CanalPlanAC  If anyone wants to see where we are likely to be. It gets updated with actual position each night.

It turned out the mooring I chose last night was not as good as I hoped for, yes we had a full length pontoon but we also had music until 1 am this morning right beside us. I will not make that mistake again.

This morning I rang the lock keeper to ask about levels, he said it was fine and if we were in the basin he was just locking a Narrowboat out. as we weren't he suggested we wait until 1030 ish. as the Edward Elgar was coming down the river and we wouldn't really want to meet that in the partings, so at 1000hrs we made our way into the basin and tied to the wall and waited for the lock, we were joined by a wide beamed boat and I suggested he went ahead of us as I was sure he would be faster. It wasn't long before The Edward Elgar was coming into the lock, they have to raise the road bridge for her to come in but she is short enough to sit between the top gates and the bridge while the lock fills.DSCF2212

As soon as she was clear the wide beam entered the lock and we followed. The lock keeper told us that the tide would top the weir at about 1130am. so watch out for debris in the river.

We locked out at a steady 3 MPH and maintained that speed most of the way up the partings against the flow, the wide beam was soon out of sight. About a quarter of a mile before the end of the partings our speed dropped to less than 2 MPH and it felt like we were standing still in the flow, we pushed on and at the end of the partings our speed increased to 4½ MPH all without me changing the engine speed and we carried on between 4 and 4½ MPH all the way to The Red Lion at Wainlode Hill where the river flow started to pick up again. We were going to stop at Haw bridge but with a couple of cruisers there already there was no room for us, so we carried on eating lunch on the move. The Avon river use to discharge into the Severn down by the rowing club at Lower LodeDSCF2214 as can be seen on this map from Waterway Routes. lower lode

The river by now was flowing at its full rate and we were back down to 3½ MPH. As we approached the lock there was very little drop over the weir so not much of a rise in the lock.DSCF2217

The flow seemed much less as we made our way to the cut leading to TewkesburyDSCF2218 and then just passed the lock to moor for the night, this cost us £5 from the Avon River Trust.

Today's Journeymap 24

14 Miles 2 Locks in 4¼ hours

Friday, 16 August 2019

Gloucester Friday 16 August 2019

Day : Friday
Date : 16 August 2019
Start : 1015
Finish : 1400hrs Gloucester

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12083_8OnD9OH41v if anyone wants to see where we are likely to be. It gets updated with actual position each night.

Well we woke to the rain again, we set off down to Saul Junction to do a pump out, but when we arrived found it "out of order" so carried on down to the one in Gloucester, I must say it worked well. Once finished we winded, not easy with the way the buildings funnel the wind and headed back a short way to Sainsbury's, its quite good as they have 4 hr moorings right at the back of the shop, just a pity there is no checkout this side. After the pumpout I had my eye on a nice mooring just outside the Brew House, I dislike those short pontoons in the basin, especially if its a bit windy, anyway our luck was in and it was still vacant once the shopping was complete so that is where we are.

Today's Journeymap 23

9 Miles 0 Locks in 2¾ hours

Thursday, 15 August 2019

Fretherne Bridge Thursday 15 August 2019

Day : Thursday
Date : 15 August 2019
Start : 1030hrs.
Finish : 1600 hrs Fretherne Bridge

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12166_45HNL5akO9 if anyone wants to see where we are likely to be. It gets updated with actual position each night.

Well last nights crew change went well, we now have George the younger Grandson and have given back Brian and his dog Spot.

This morning we woke to sunshine and set off back to Sharpness. On the way we passed another group of Stand up Paddle boarders (SUP) and the instructors had their dogs with them, he didn't look that impressed, unlike the one we saw later.DSCF2180

At Sharpness we winded and returned to the old Railway swing bridge where we stopped to show George and explain the disastrous loss of the two oil tankers in the fog.DSCF2186

After lunch we carried on to Purton to look at the hulks again, we did this yesterday with Brian in the rain, they look much better in the sunshine.DSCF2194

The is now two memorial stone to the crews who lost their lives in the bridge disaster, one of them is at Purton.DSCF2197

We also took the opportunity to fill with water at the water point there. We then made our way to Fretherne Bridge for the night. On the way we not only passed another group of SUP's again the instructors still had their dogs onboard, but the black one looked much happier.DSCF2204

We also passed a boat with an outside clay oven, he had it fired up when we passed the other day.DSCF2203

We were hoping to moor close to the bridge, but one side in no mooring for 400 yards and the other side is a long stretch of long term moorings before you come to the visitor moorings where there was room for just 2 boats.

Today's Journeymap 22

11¼ Miles o Locks in 4 hours

Wednesday, 14 August 2019

Patch Bridge Wednesday 14 August 2019

Day : Wednesday
Date : 14 August 2019
Start : 1000
Finish : 1700 Patch Bridge

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12166_Mx96lQ3HsO if anyone wants to see where we are likely to be. It gets updated with actual position each night.

It rained hard overnight and was miserable most of the day with very heavy drizzle. We did hang around but just after 10 we decided to push off. I do like the old lock houses down here with their Roman columns each side of the front doors.DSCF2166

We passed the old Castle cafe that is now looking very poorly and unused.DSCF2168

A little further on I was able to get this shot of a Kingfisher hopping around on a boat before it departed into the trees.DSCF2169

After a stop for lunch we carried on to Purton. The swans in this area seem quite aggressive to each other at the moment DSCF2174

The reason we came was for a walk round the hulks, this was our planned stopping place for the night and to crew change the grandsons, but there were no convenient moorings, so we traced out steps to Patch Bridge. I rang the bridge keeper on the way to tell him what we were doing so that he didn't go to the trouble of opening the bridge as he saw us coming.

Today's Journeymap 21

14 Miles 0 Locks in 4¾ hours

Tuesday, 13 August 2019

G&S Hempsted Bridge Tuesday 13 August 2019

Day : Tuesday
Date : 13 August 2019
Start : 1000 hrs
Finish : 1745 hrs. Gloucester rowing club

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12117_Z8HGnO96Lo if anyone wants to see where we are likely to be. It gets updated with actual position each night.

This morning Diana and Brian took Spot for a walk while I moved down to the water point to top up the tank. The timings were spot on, they arrived back just as I was clearing away the hose and at the same time a cruiser had just left the bottom of Tewkesbury lock so that it could be turned for us. It was a lovely day on the river and we met a few boats coming upstream, the first just before we reached Upper Partings lock, so the lock was in our favour but the gates were shut, it was only minutes before we had a red flashing light, I am making the lock ready, followed by a green light, you may enter the lock. Due to the levels we only dropped about 4 feet and were soon away.
We passed some cows having a refreshing drink in the shallows of the river.DSCF2157

As we approached the Partings this cruiser had just left the narrows coming up and opened it up, when he saw us he throttled back again so very little wash, also his exhaust had cleaned up by then.DSCF2160

As we made our way down the partings, 5 mph on just over tick over I tried to ring Gloucester locks but he was engaged, I tried several times without success so abandoned the phone and picked up the second set of ladders against the wall on the lock approach with my stern line and then called him again, this time successfully. When he drained the lock ready for us the flow of water actually moved us backwards, at the time I would estimate the current to be a little over 3 MPH. As soon as I had a green I went forward staying close to the wall with just enough power to maintain steerage until I was at the mouth of the lock, a quick burst of power and we were in, safe and sound.

Once in Gloucester we moored to one of the pontoons and had a lunch before spending a bit of time in the Gloucester Waterways Museum. When we returned to the boat we decided to move further along the canal for the nigh so have moored just south of Hempsted Swing Bridge. Since we have been here we have seen a group of 13 hot air balloons drifting across the countryside.DSCF2165

The height of the river at Gloucester was 0.86 from the government web site but the site gives no indication of flow, its just for flood purposes.

Today's Journeymap 20

15 Miles 3 Locks in 4¼ hours

Monday, 12 August 2019

Tewkesbury Monday 12 August 2019

Day : Monday
Date : 12 August 2019
Start : 1030
Finish : 1400 Tewkesbury

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12117_OA8Kw159HU if anyone wants to see where we are likely to be. It gets updated with actual position each night.

Lovely quiet mooring last night, we didn't hear a sound. This morning was clear and bright but the river had come up overnight and was just in the orange. A hire boat came by at 1030 so we set off behind them with the plan of sharing locks. It wasn't long before we passed some posh moorings, maybe now he is saving up for a bigger boat?DSCF2134

We caught up with the hire boat at Nafford Lock where a boat at some time had come to grief on the weir.DSCF2136

As we arrived the hire boat was just on the lock landing and another boat was about to leave the lock coming up, so I reversed out of the way back upstream a bit. If you don't have a clear run coming out of the lock you can easily get trapped against the buoys across the weir. 2 boats have done it in the past 2 days. Once below the lock the water level was back in the green. This lock has a swing bridge across the chamber that you have to close when you leave, I can think of three like this.

Looking back as we went down the river I could see a tower on the hill top in the distance, I don't know where it is.DSCF2137

I use a navigation program called Waterways Routes, its downloaded onto my Ipad so doesn't need a data connection and tracks exactly where I am by satnav. One of the many useful points is that I can see where the weirs and locks are in relation to me as I approach them.DSCF2140

This is coming into Stensham lock. Below the lock is another swing bridge but this one is a bit larger and has a winch to open and close it, thankfully its left openDSCF2143

A little further down I looked round and this Buzzard was sitting in a willow looking back at me as I went by.DSCF2144

Looking up on the hill side we spotted what looked like yellow flags all over the field, as we got a bit closer we could see it was actually farm workers and from the smell it was probably onions they were harvesting.DSCF2146

We were going to stop at Twinning for lunch but there were already 2 boats on the mooring so we continued the short distance down to Tewkesbury and moored between King John's Bridge and the lock, these moorings are run by the River Avon Trust and cost £3 per night, it was lucky we arrived when we did as they are now full.

Today's Journeymap 19

10½ Miles 2 Locks in 3½ hours

Sunday, 11 August 2019

Comberton Wharf Sunday 11 August 2019

Day : Sunday
Date : 11 August 2019
Start : 0930
Finish : 1630 Comberton Quay

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12117_O9HU4CbJ74 if anyone wants to see where we are likely to be. It gets updated with actual position each night.

Yesterday evening the weather improved dramatically, in fact it was too good as the two hire boats moored at out stern were out on the deck until midnight talking loudly.

This morning we woke to sunshine and set off at 9-30 am, the river was much slower and it was all very pleasant. The Evesham ferry man waited until we passed before winching his chain taught DSCF2116 across the river and a few minutes later was crossing with the ferry to pick up a passenger from the far bank.DSCF2118

As the day went on the weather deteriorated, starting with short showers going on to persistent rain right until just after we moored up.

The weirs on the Avon are fitter with fish and eel ladders so that they are no longer barriers for fish moving upstream, The channel with the weed in also has a stiff green bristle material along one side.DSCF2120

We stopped for lunch just above Wyre lock at the head of the weir stream against the lock island, watching some of the cruisers perform is just something else. There was a rather interesting two story wide beam boat moored across the way, they have a decked barge moored alongside as a patio with Astra turf on it.DSCF2126

We stopped at Pershore for water, the allocated mooring is a bit short, but it wasn't helped by a hire boat moored with its stern in the reserved area, I had to moor with my stern along side it. While taking water Diana and Brian went to Asda. Just as I had cleared the hose up and was about to set off to the visitor moorings the hirers returned, but didn't say a word about me attached to their offside. Right by the water point is a water sports centre and today they were doing paddle boarding going upstream to the next lock.DSCF2127

When Diana and Brian returned we carried on downstream passing this boat with a fine collection of items on its roof.DSCF2130

The first mooring we were going to spot at was right by a road bridge so we gave that one a miss, the next backed onto a busy road, so we pushed on to Comberton Quay which is well away from any roads, there was one boat there already but that looks locked up and left, there was also a tent with two lads in, it seems we have moored in their fishing spot, but as it was raining they were zipped up in the tent. The did do about a hours fishing between the stern of our boat and the next one, but have since gone home. Now we have tied up the sky has cleared and its looking much more promising.

Today's Journeymap 18

15½ Miles 4 Locks in 5¼ hours

Saturday, 10 August 2019

Evesham Saturday 10 August 2019

Day   :Saturday 
Date :10 August 2019
Start :1000
Finish :1630 Evesham

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12117_-9OILoW8H5 if anyone wants to see where we are likely to be. It gets updated with actual position each night.

Well last night 8 of us turned up at a Thai restaurant with no booking and had great service and good meals, so if you want a good Thai meal in Stratford upon Avon then I recommend The Giggling Squid.

Overnight the water levels stopped rising so this morning so it was off to The River Avon Trust office to part with money for a 5 day licence. Another boater was already in there buying a licence so we shard some of the locks with him. As I approached the first river lock we met a boat coming out, unfortunately the lock had already been turned by a trip boat right behind him, needles to say it also started to hammer down with rain. Some canoeists were enjoying the extra flow down the weir.DSCF2100

We did the next lock together but unfortunately the other boat was travelling a bit slow, I was on tick over and keeping up with him which gave me very little steerage in the strong winds so I had to pass and watch him drift into the reeds. There was nothing I could do to help, the river was too narrow to turn and no way could I back up in that current and high wind. I did however ring the Navigation emergency line to tell them of his plight. (update we are in Evesham and he is now moored up here)

As I approached Bidford bridge I could see a hire boat coming upstream so I had to do a bit of back peddling until he had cleared the bridge against the flow. We had planned to stop here but boats were already breasted along the visitor moorings.

The river was up a bit with some of the landing stages just underDSCF2102 water but still in the green. As we passed George Billing Lock the emergency services were on the adjacent field.DSCF2115

Yesterday we passed fields of Christmas Trees, today it has been fields of willows.DSCF2108

All locks these days have a marking to indicate where the edge of the top gate cill is so that boats can avoid getting hung up, today we have seen a choice of spellings.

DSCF2105 DSCF2114

I must say I find these notices a real pleasure to see, I just wish it was the same on the canals.DSCF2104

One of the locks we passed through is known as The Robert Aickman Lock and they have incorporated the Inland Waterways Association sword into the design.DSCF2110

Evesham lock proved interesting with the cross flow in front of the lock, as you approach you have a long weir on your left with a guard/walkway which now incorporates the lock landing with bollards and just to the right the inflow to an electricity generating turbine. At least then now have large signs warning you of the current. Once trough the lock we just dropped down into the town to moor on the town moorings overnight.

Today's JourneyMap 17

20 Miles 11 Locks in 6 hours

Friday, 9 August 2019

Stratford upon Avon Friday 9 August 2019

Day :Friday
Date :9 August 2019
Start :0845
Finish :1330 Stratford upon Avon

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12117_Y927nOaHHF if anyone wants to see where we are likely to be. It gets updated with actual position each night.

Boy did you rain overnight, over 22mm. we even had thunder this morning, but thankfully a little before 8 o'clock it stopped and stayed fine until about half one.

As the forecast was rubbish we set off a little before 9 am. Needles to say a boat went by about 8 am so all the locks were against us. With Diana setting ahead and Brian closing up the lock after I left we made good progress on the first 4 locks, then we met the Volockie who wouldn't let Di draw the paddle of the next lock until after I had started emptying the one I was in. He walked off and left us to it.

We only met one boat coming up from Stratford and that was after we had stopped to fill with water. needless to say he came along just as my had blew off so I was unable to retrieve it, still it was one I found in the canal in the first place.

The last couple of bridges just below locks 55 and 53 are quite low, about half an inch above the weather station.DSCF2091

The moorings leading into the basin were all full so we wondered what we would find, but once in the basin there were only three boats there, so we slipped backwards into one of the pontoons still in the sunshine, however while we were having lunch it started raining a bit, so good timing for once.

I walked the River Avon Trust office/boat to get a licence for the river tomorrow to be greeted with the information that they have had a hi flow alert from the EA for the water further upstream, so a decision on the licence will be made tomorrow morning.

Today's Journeymap 16

4½ Miles 16 Locks in 3¾ hours

Thursday, 8 August 2019

Wilmcote 48hr moorings Thursday 8 August 2019

Day : Thursday
Date : 8 August 2019
Start : 1000 hrs
Finish : 1700 hrs Wilmcote winding hole

I have uploaded our proposed route to CanalPlanAC at https://canalplan.eu/journey/12117_2fD4O9JGrH if anyone wants to see where we are likely to be. It gets updated with actual position each night.

The noise from the trains and the motorway didn't cause us any problem last night. Unfortunately a boat came past while we were having breakfast so that put all the locks against us and just after I started the engine ready to go a hire boat came down the lock behind us. This actually worked well as there were 8 onboard setting ahead and one of the ladies checked how far we were going and drew a top paddle when they left. We didn't follow them for long as at the M40 motorway lock they met their first boat coming up and were away. We had mixed luck with the locks, some with us and some against, a couple of times we had to wait as a second boat had already turned the lock when we arrived. We stopped for lunch in one of the longer pounds, but even so were well aground when we wanted to leave.

We passed a few interesting sights, firstly a herd of cows in the canal and the day had not even warmed up.DSCF2077

At one point we passed a very nice Wendy House beside the canal, I wonder if its used by children.DSCF2080

Then there was the new marina at Wootton Wawen with the biggest restaurant I have ever seen in a marina called The View, itsDSCF2081 huge. The marina, Hill Farm Marina only has 50 berths soDSCF2082 where they are getting their trade from I don't know.

We decided to carry on to moor for the night at the 48hr moorings just above the Wilmcote lock flight ready for a wet run in the morning. This is even closer to the railway than last night.

Today's Journeymap 15

9¾ Miles 17 Locks in 5¾ hours